JRP CALL information
Supported By

European Commission

Short description of the work
The work carried out at the KIT-INE Laboratories included the flow through dynamic experiments for elution of U-contaminated sediments from the decantation waste of a U conversion facility (3 columns in total). The eluate was analysed for U, Th, pH and Eh and selected aliquots were analysed for alkalinity, cations and anions. In one of the columns U-233 was injected to investigate the retention of U. Strong retention of U was observed in all the experiments. Solid characterisation of the samples was conducted in parallel, comprising XPS and synchrotron measurements. The synchrotron measurements included bulk and micro analysis by XRF and XANES.

Main visitor contact data
Name: Teresa Fernandes
Organisation: Amphos 21

 

 

JRP Identification
JRP nr: TALI-C01-09
JRP title: Desorption and Sorption of U and Th from the waste contained in the decantation basins B1 and B2 of the site of Malvési, France: dynamic experiments and beamline measurements
JRP scope: Scope 2: Actinide in the geological environment

Visited Associated Pooled Facility
Visited APF during the stay: KIT-INE - Laboratories
Name of the APF Contact Person: Thorsten Schäfer

Other APF and organisation involved in the JRP
Other organisations involved: Amphos 21, Barcelona, Spain
Other APF involved in the project: KIT-INE - Beamline

Description of the work done at the associated pooled facility
Start date of the stay: 4/4/2013
End date of the stay: 6/28/2013
Quantity of access: 51
Access Unit: Days
Misc.: